Civil Construction

Proiect
8/10 (1 vot)
Domeniu: Construcții
Conține 7 fișiere: docx, bmp, db
Pagini : 22 în total
Cuvinte : 2690
Mărime: 4.61MB (arhivat)
Puncte necesare: 8
Profesor îndrumător / Prezentat Profesorului: Radu Pescaru

Extras din proiect

1. PROJECT CONTENT

2. PROJECT THEME

The project consists in some elements of design for a building that can have one of the following destinations: block of flats; hotel; students accommodation building. The building has UG+G+4Fl and it is placed in urban area on a land with the natural slope of 2% and connected to the city services facilities.

The structure will have:

- pedestrian or non pedestrian reinforced concrete flat roof;

- monolithic or precast reinforced concrete shear walls combined with lamellar frames;

- reinforced concrete floor slabs and stairs;

- elastic cross beam or mat concrete foundations under the load bearing walls and columns.

- The envelope of the building consists of:

- load‐bearing walls of reinforced concrete or non load‐bearing walls of hollow brick or cellular concrete block masonry protected on the external face with al layer of efficient thermo insulating materials (fireproofed expanded polystyrene for face wall, mineral wool rigid plates, extruded polystyrene etc.);

- ventilated or un‐ventilated could (insulated) terrace roof;

- the ground floor plate over unheated basement will be insulated on the ceiling of the basement;

- the doors and windows can be of multi‐layer wood or PVC profiles with thermal insulating double or triple glassed window panels with Low CTE float glass. The windows will be provided with ventilating systems or with three opening positions in order to provide a adequate thermal protection and natural ventilation of the indoor space;

- the staircase is insulated and heated. The project must contain information and details about:

- the type and the composition of structural and for envelope elements ( walls, columns, floors, foundations, and roof);

- the joints of the main structural and for envelope elements;

- the heat conservation capacity of the building;

- the structural performance under the load combination that contain dead, snow, live loads and seismic action.

The thermal and structural design and the constructive details of the elements already mentioned.

3. TECHNICAL REPORT

3.1 General data

CONSTRUCTION: MULTI‐STOREY BUILDING Designer: Ursachi M. Razvan

Height Regime: UG+G+4Fl Address: FAGARAS

Site characteristics

The site is situated in Fagaras, in the eastern part of the city. The site has an insignificant slope. The field has a local and general stability assured by respecting the instructions from the geotechnic study.

The destination of the building: block of apartments; hotel; hostel building for students. The placement has access to public utilities (water, sewerage, electricity).

- The land satisfies all the conditions to be built in, and stable;

- The foundation will over cross the freezing cote 0.9m;

- Land slope ‐ 2 %;

- Seismic zone ;

- The snowing 2.0kN/m2 ;

- The climate region – IV zone; Te=‐21oC 3.2.Urbanism conditions

- Water supply will be made by joining the water network having the authorization obtained from S.C. APAPROD S.A., FAGARAS

- Electricity supply will be made having the autorization obtained from „E.ON, FAGARAS S.A.”

- The sewerage will be made by joining the sewerage network from the neighbourhood .

- The heating will be made individually by central heating.

Preview document

Civil Construction - Pagina 1
Civil Construction - Pagina 2
Civil Construction - Pagina 3
Civil Construction - Pagina 4
Civil Construction - Pagina 5
Civil Construction - Pagina 6
Civil Construction - Pagina 7
Civil Construction - Pagina 8
Civil Construction - Pagina 9
Civil Construction - Pagina 10
Civil Construction - Pagina 11
Civil Construction - Pagina 12
Civil Construction - Pagina 13
Civil Construction - Pagina 14
Civil Construction - Pagina 15
Civil Construction - Pagina 16
Civil Construction - Pagina 17
Civil Construction - Pagina 18
Civil Construction - Pagina 19
Civil Construction - Pagina 20
Civil Construction - Pagina 21
Civil Construction - Pagina 22

Conținut arhivă zip

  • Civil Construction
    • current floor.bmp
    • details.bmp
    • ground floor.bmp
    • roofplane.bmp
    • Thumbs.db
    • URSACHI_RAZVAN.docx
    • vertical section.bmp

Alții au mai descărcat și

Izolații

Romania dispune de o impresionanta substanta istorica , care documenteaza cronologic schimbarile tarii si impreuna cu acestea, istoria diferitelor...

Caiet practică tencuieli, finisaje

Caiet de practică Executarea lucrărilor de tencuială , zugrăveală şi vopsitorii Tencuiala este stratul de finisaj aplicat pe suprafaţa brută a...

Calcul Cofraje

Număr de ordine: 37 1. Date iniţiale : - grosime placă : hpl= 16 cm - înălţime nivel : Hnivel = 2.80 m - dimensiuni în plan a plăcii : 3.95 x...

Construcții

1.3 Coordonarea modulară şi toleranţele Coordonarea dimensională în construcţii reprezintă metoda de stabilire a dimensiunilor şi poziţiilor...

Tehnici de Modelare Fizică

1. OBIECTUL TEMEI Obiectul temei reprezintă modelarea fizică a fenomenului de convecţie forţată în interiorul conductelor circulare. Se va modela...

Te-ar putea interesa și

Contabilitatea imobilizărilor corporale

Imobilizările corporale sunt active care: - sunt deţinute de o persoană juridică pentru a fi utilizate în producţia proprie de bunuri sau...

Descrierea Voiajului

Cu câteva decenii în urmă, înainte ca avionul sau nava cosmică să-si facă aparitia, prin navigatie se întelegea, implicit, navigatia maritimă,...

Local culture’s impact on international marketing - base Turkey-Romania culture differences on international marketing

Chapter 1 Culture and international marketing Culture is part of the external influences that impact the consumer and represents influences that...

International economic cooperation and its role in the development of national economies

Introduction Economic theory says that any country trying to find the " magic formula " economic policy , which could simultaneously achieve...

Asigurarea de răspundere civilă profesională

INTRODUCERE Asigurările s-au născut din nevoia de protecţie a omului împotriva calamităţilor naturale, împotriva consecinţelor accidentelor, şi a...

Tourism Economy - Olt

1. General informations Settlement: In the south of Romania, beside Olt river. Neighbors: East: Arges and Teleorman, in the West: Dolj...

Schneider Electric - Expand, Modernize and Rationalize

In its 170 years of existence, Schneider Electric has successfully met many challenges by making important strategic choices The Company's...

Report on Simcor Grup

1. Research in PR A. Analysis of the situation: Issues management: we make inquiries into how other organizations have handle situations, we use...

Ai nevoie de altceva?